Arqiva Project - Advantage Air Systems

What We Did

Advantage Air Systems was responsible for the provision of cooling to the transmission hall – from the detailed design through to the final installation and commissioning.

From the high internal cooling load, to the need for the elimination of single point failure, the project shared many similarities with the cooling requirements more commonly found in datacentres.

Due to the very specialist nature of the project, resilience was fundamental to every aspect of the installation – be it the transmission equipment itself or the site infrastructure supporting it. In order to satisfy these stringent requirements, the equipment we selected was chosen because of its modular nature, minimising the impact of any downtime and enabling changes to the room layout should they be required in the future.